|
When the solidification and cooling period is over, the casting is released from the mold, the sand and frame are saved and recycled for future mold development. Each piece undergoes a precisely determined cooling period to insure that its physical properties are consistent with the client’s specifications.
The piece is then freed of its risers and feed runners, shot-blasted and cleaned up.
If required, the casting can then undergo any of these:
- Thermal treatment
- Machining
- Painting
- Or additional testing
After an exhaustive final inspection, it can finally be shipped to the client.
|